Jury rig to assembly the top section, rotor, and beam on the ground.
View of the tower sections and yagi elements ready for assembly.
Ready to go!
Installing the inverted-V for 40 and 80 meters.
House bracket and fixture to route feed lines into attic.
Close-up of the fixture.