03a.jpg (32767 bytes) 02a.jpg (32258 bytes) 06a.jpg (26275 bytes) 07a.jpg (11051 bytes)
Jury rig to assembly the top section, rotor, and beam on the ground. View of the tower sections and yagi elements ready for assembly. Ready to go! Installing the inverted-V for 40 and 80 meters.
05b.jpg (18977 bytes) 05a.jpg (7341 bytes)
House bracket and fixture to route feed lines into attic. Close-up of the fixture.